Arusha, Tanzania | XINHUA | Connecting the Mwanza and Geita regions, the Magufuli Bridge project over Lake Victoria in Tanzania is built by China Civil Engineering Construction Corporation (CCECC). The main bridge has a total length of 520 meters and the project is expected to be completed by the end of 2024.